CAPA Drain
Rua Ribeiro Cambado 4440-695 1491 Norte Alto da Serra - Valongo, Portugal
+351 224 219 600 +351 224 219 609 comercial@capadrain.com PME Líder, PME Excelência, TÜV Rheinland ISO 9001:2008 CAPA Drain 452083025
CAPA, S.A.
1994
Vila Nova de Gaia, Portugal
https://capadrain.com/uploads/seo/big_1520874681_3349_CAPA_Drain.png
110 110
501628010

Products

Polypropylene Steps

Steps for underground visiting boxes.

Features

  • Made of Ø 12 mm steel rod encased in virgin polypropylene copolymer polypropylene;
  • According to standard EN13101: 2002;
  • Non-slip relief and side wings for added safety;
  • Orange color to enhance visualization.

Installation Location

Insert the 85 mm step into the well. 
Recommended distance between steps: 300 mm. 
Drill 2 holes, in line, with a 25 mm drill bit, according to the separation and depth indicated on the board. 
In these holes will be placed the step, giving alternating strokes at each end until reaching the total depth. 
If the holes are accurately drilled, they do not require filling mastic. 

Note: The blows should be given with a rubber mallet or guarding the step with a wooden board.


Type Reference Length Width
300 Curved 922035 235 300
300 rectum 922036 233 330

 

CAPA reserves the right to make changes to the product without prior notice.
Cookies help us to offer our services. By using our page, you agree to our cookies policy.
Learn More